BUILT ON MUNICIPAL UTILITY EXPERTISE (ENOVA POWER/CITY OF KITCHENER) AND INDUSTRIAL LABOUR LOGISTICS (HIRED CANADA).
100MW of High-Density, Liquid-Cooled Infrastructure. 100% Canadian-Owned. Powered by the Future of Skilled Trade Logistics.
ABSOLUTE SOVEREIGNTY
As a 100% CCPC, we provide a "Legal Shield" for Canadian data. No foreign jurisdictional reach. No foreign "Compute Flight." Just sovereign infrastructure governed by Canadian law.
THREE PILLARS
A BETTER NEIGHBOUR TO THE GRID.
HYPER-DENSITY ENGINEERING
Designed for the 125kW rack era. Utilizing Direct-to-Chip (D2C) with a projected 1.08 PUE, we are the most efficient AI Factory in the Waterloo corridor.
We don't just consume electrons, we manage them. 50MW (Battery Storage) and deep-rooted municipal frameworks, acting as a grid stabilizing asset for Ontario during peak demand.
Powered by Hired Canada labour pipeline. We own our own our supply BESS (Battery Energy Storage Systems) ensuring Phase 1 (20MW) delivery in Q4 2027 despite national peak shortages.